Commit 738c6168 authored by Linus Kemme's avatar Linus Kemme

Added readme. Uploaded Distro_1.mat

parent c83576a9
#**/*.mat
**/*.docx
**/*.metadata
**/*.m~
......@@ -7,5 +7,5 @@
**/*.7z
**/*.tmp
**/*.png
**/*.mat
====================================================================
EV charging station power profile generator
====================================================================
09.11.2019, Linus Kemme
-----------------------------------------------------------------------------------------------------------------------------
This Matlab script generates a load profile for ev charging stations.
Run BA_generate_profile.m with MATLAB R2018a
-----------------------------------------------------------------------------------------------------------------------------
Enter the following values:
Duration in days (minimum 30 days)
Resolution in minutes (1-60)
Scale Factor
This is a measure of the utilization of the charging station according to the amount of ev on the street. 1 refers to 111,000 evs in Germany in 2018. The Scale Factor simulates a higher share of evs. 2 would then refer to 222,000 evs, leading to a higher utilization of the charging station, assuming that the amount of charging stations stays constant.
Location category
1: close to business park
2: close to business park & residential area
3: close to city center & residential area
4: close to residential area
5: close to residential area & shops
6: all mixed together
Multiplexing
= allowing more cars to connect to one charging station. They will then automatically be charged sequentially.
Summertime
Add the time switching to the power profiles
Number of profiles
Save
Save the profile and a verification graph in /Results
Format: Date (YYYY-MM-DD HH:MM:SS); Power (W, kW or MW)
The unit of the power can be set in the script BA_generate_profile.m in %% Settings
-----------------------------------------------------------------------------------------------------------------------------
The script will then create and save the profiles in /Results.
The generation is based on measured charging processes of 256 charging stations in north-west germany from 2016-2018.
Contact linus.kemme@uol.de for further information
\ No newline at end of file
Markdown is supported
0% or
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment